MetaData Aggregator

Network Summary

Legend:
A P R X ?

7A (2019-01-01 - 2019-12-31)

Network
7A
Description
Multi-scale imaging of the Main Pamir Thrust faults within the framework of CaTeNA project – Climatic and Tectonic Natural Hazards in Central Asia
Start
2019-01-01 (001)
End
2019-12-31 (365)
Data Center
  • GEOFON
# Stations
7
Station Data Center Start End
C01
  • GEOFON
2019-06-12 2019-08-17
C02
  • GEOFON
2019-06-12 2019-08-17
C03
  • GEOFON
2019-06-12 2019-08-17
C04
  • GEOFON
2019-06-12 2019-08-17
C05
  • GEOFON
2019-06-12 2019-08-17
C06
  • GEOFON
2019-06-12 2019-08-17
C07
  • GEOFON
2019-06-12 2019-08-17

7A (2013-01-01 - 2016-12-31)

Network
7A
Description
Mid-Atlantic Geophysical Integrative Collaboration
Start
2013-01-01 (001)
End
2016-12-31 (366)
Data Center
  • IRISDMC
# Stations
3
Station Data Center Start End
CABN
  • IRISDMC
2013-10-25 2016-10-24
CAKE
  • IRISDMC
2015-07-01 2016-10-24
CDRF
  • IRISDMC
2014-10-24 2016-10-24

7A (2012-01-01 - 2012-12-31)

Network
7A
Description
Wide-Angle seismic reflection Experiment across the Central Iberian Zone; Iberia Peninsula
Start
2012-01-01 (001)
End
2012-12-31 (366)
Data Center
  • IRISPH5
Assembled data
12-007
# Stations
14
Station Data Center Start End
8
  • IRISPH5
2012-05-05 2012-05-11
80
  • IRISPH5
2012-05-06 2012-05-11
800
  • IRISPH5
2012-05-06 2012-05-11
801
  • IRISPH5
2012-05-06 2012-05-11
802
  • IRISPH5
2012-05-06 2012-05-11
803
  • IRISPH5
2012-05-06 2012-05-11
81
  • IRISPH5
2012-05-06 2012-05-11
82
  • IRISPH5
2012-05-06 2012-05-11
83
  • IRISPH5
2012-05-05 2012-05-11
84
  • IRISPH5
2012-05-05 2012-05-11
85
  • IRISPH5
2012-05-05 2012-05-11
87
  • IRISPH5
2012-05-05 2012-05-11
88
  • IRISPH5
2012-05-05 2012-05-11
89
  • IRISPH5
2012-05-05 2012-05-11
00:37:49 v.22510d55