The TMT deployment model requires a field
operation that does not operate synchronously with the seismic deployment, though the goal remains to occupy the same geographic areas
simultaneously
¥TMT will be responsible for its own siting and
permitting
¥Synergy with TA will occur when opportunities
arise
¥
Funds in hand from O&M to
cover site selection, permitting and installation through GFY08
¥Discussions with MT installation contractors
have commenced.
¥